LLC SPA Sibelectroshield provides services in designing new constructions, reconstructions, enlargements, technical reequipments of production, and also technical audit of whole energy-complexes or local objects.
Designing works are based on the allowance of self-regulating organization SRO-NP-SPAS-202G-5501087918-0137.
Types of designing works:
· Technical audit of real energy-objects for identifying expediency and the amount of reconstruction works;
· Information acquisition for designing (all types of examinations, development and coordination of technical conditions connected with connections to the networks);
· Development of design and work documentation connected with capital constructions, reconstruction of energy and network objects of 0.4, 6(10), 35, 110 Kilovolt;
· Planning estimate documents connected with building and reconstructing enrgy-objects;
· Calculating project feasibility for building.
LLC SPA Sibelectroshield provides:
· Development technical tasks, design and work documentation for updating and reconstructing real and new energy-objects;
· Consultations, support in scientific and technical documentations connected with power-supply system designing and automation;
· Coordination of projects in all agencies and working with them at all the stages;
· Field supervision.
LLC SPA Sibelectroshield designs networks:
LLC SPA Sibelectroshield experts make complex design of networks for industrial and civilian object:
· Heating
· Water supply
· Gas supply
· Conditioning
· Ventilation
· Power supply
· Telephony
· Development plan
· Environmental protection
· Security system:
- fire alarm;
- video surveillance;
- access control system;
- perimeter security system;
- emergency alarm system.
Main stages of network designing:
There are four main stages in the process of designing networks by our company:
· Working out a draft project of the network systems and technical and economic assessments (TEA) of the network’s developing, which consists of project statement (PS) and commercial offer (CO).
· Working out the wiring diagram of the network system.
· Working out all sections of the project documentation connected with the network systems.
· The design is made in compliance with the State Standard and Construction Norms and Specifications of Russian Federation, and also in compliance with State Standard and Construction Norms and Specifications of CIS and non-CIS countries.
The whole complex of designing works is made by our own designing departments.
Designing works are made by top qualified and certified technicians-and-engineers who are really experienced in organizing and controlling of topographic-geodesic and land measuring works, also designing of the constructing part of the object, systems of relay protection and emergency controls, telemechanics and communications.
Designing works which were done (the main objects)
|
¹ |
Customer |
Object. Types of works: |
|
Designing works. | ||
|
1 |
ZAO “Sibirskiy inzhiniringovyy centr”, |
Branch “MRSK Sibiri” - “Kuzbassenergo-RES” Designing works of power bays 6 kV PS 110/35/6 kV reconstructing “Prokop’evskaya”, Novokuzneck city: - reconstructing power bays 6 kV; - equipment protection on microprocessor-based unit; - Automated Informational-Measuring System KUE; - electromagnetic compatibility. |
|
2 |
OOO “Arhitekturno-proektnoe stroitel'noe ob’edinenie”, Omsk city |
Branch “MRSK Sibiri” - “Kuzbassenergo-RES” Designing works of reconstructing PS 35-10 kV “Nikolaevskaya” with changing OD-K 35 kV on gas-insulated (vacuum) switches, equipment protection, electromagnetic compatibility. |
|
3 |
OOO “Arhitekturno-proektnoe stroitel'noe ob’edinenie”, Omsk city |
Branch “MRSK Sibiri” – “Omskenergo” Designing works of reconstructing PS 110 kV “Gor’kovskaya” with changing chargeable battery and rectifier charger. |
|
4 |
OOO “Omsktehuglerod”, Omsk city |
OOO “Omsktehuglerod” (black carbon manufacturing) - Reconstruction of plant’s power-supply system. Designing works unclude: - Reconstruction of switchgear-1 (TP and RU-0.4 kV); - Temporary electric power supply with the 2EPTS - external package transformer substation-630/10/0.4; - Electrical network 0.4 kV (inside the plant); - Electrical network 10 kV (more than 1500 m); - 2 cable bridges of 980 m. |
|
5 |
OOO “Derevoobrabatyvayuwaya kompaniya "MEKRAN", Krasnoyarsk city. |
- Working out the project document for modular integral unit transformer substations 2BKTP-1250/10/0.4. |
|
6 |
GUP SO “OBLKOMMUNENERGO", Ekaterinburg city. |
GUP SO “OBLKOMMUNENERGO", Ekaterinburg city. 1. Designing works in reconstructing PS 110/10 kV “Poldnevaya”; 2. Designing works in reconstructing PS 110/10 kV “Shitovskaya”; 3. Designing works in reconstructing PS 110/6 kV “Verhovino-Uspenskaya”; |
|
7 |
OOO “Arhitekturno-proektnoe stroitel'noe ob’edinenie”, Omsk city |
Branch “MRSK Sibiri” - “Kuzbassenergo-RES” Reconstructing PS 35-10 kV “Nikolaevskaya”: - equipment and automatic reconstruction; - changing OD-K 35 kV on gas-insulated (vacuum) switches; - working out measures for electromagnetic compatibility of microprocessor-based unit; - active and reactive energy accounting. |
|
8 |
ZAO “Sibirskiy inzhiniringovyy centr”, |
Branch Filial «MRSK Sibiri» - «Altayenergo» Designing works in reconstructing PS 110/10 kV “Kulundinskaya”, Kulunda Station of Kulunda Region Altai Region. |